新闻资讯

News

current position: Home > News > group dynamic

ContactContact Us

CO-NELE GROUP


Address: No.413,Tieqishan Road,Chengyang District,Qingdao


Sales hotline: +86+0532-87876387    +86+13730927018


Company fax: +86+0532-89651313

 

Service hotline: +86+400-6362101


It is safer to operate the concrete pump truck according to the instructions

2021-12-29 14:54:41
times

Concrete pump truck in accordance with the requirements of the manual operation is safer:

Concrete pump truck manufacturers to provide product use and maintenance instructions, is the operator operating equipment necessary information, first of all, the instructions will repeatedly emphasize, due to the pump truck machine parts processing, assembly and adjustment factors, the friction surface rough, with small surface contact area, uneven pressure conditions. During the operation of the pump truck, the concave and convex parts of the surface of the parts are fricted with each other, and some metal debris is ground down. These metal debris, also known as abrasive, continue to participate in the friction, and accelerate the wear of the surface of the parts. Therefore, during the running-in period of pump truck, it is easy to cause wear of parts (especially with the surface) and wear speed is fast. At this time, if the overload operation, it may lead to the damage of parts, early failure.

混凝土泵车

 Before operating the machine, be sure to read the operation and maintenance instructions, the running-in period of the service life and fuel consumption of the car has a great impact, because the wear of the running-in period will make parts surface strain scar. The rough scar will increase friction resistance, the scar will also accommodate metal chips, sludge and other particles containing debris, these debris in the movement will continue to expand wear, will cause failure in the future, so the running-in quality determines the life of the vehicle.

混凝土泵车

Therefore, the owner in the run-in period of the time range, must let the pump car work and rest, so as to play the use of equipment to the greater. At the end of the run-in period, the machine should be maintained, checked and adjusted, and the replacement of oil should be paid attention to. Keep the pump car clean, timely adjust and tighten loose parts, in order to prevent the wear and tear of parts or parts loss caused by loosening.

混凝土泵车


混凝土泵车

Recently Viewed:

Related products

news.related_news

Scan for consultation

Phone: +86+13730927018

Fax: +86+0532-89651313

Email address: coneleoffice@163.com

Address: No. 413, Tieqishan Road, Chengyang District, Qingdao


Sales Hotline:

+86+0532-87876387

Copyright © CO-NELE GROUP All rights reserved Filing No.:鲁ICP备09030349号-6 Mainly engaged inConcrete pump truck, concrete pump, concrete delivery pump, Welcome to inquire!